Definition, Meaning & Synonyms

load-factor

noun
/ˈloʊd ˈfæktər/
Definition
The ratio of the actual output of a power plant to its potential output over a period of time.
Examples
  • The load-factor of the solar plant increased during the sunny months.
  • A higher load-factor can lead to lower electricity rates for consumers.
Meaning
Load factor is a measure of the efficiency and utilization of a power plant’s capacity. It indicates how consistently the plant is being used relative to its maximum potential.
Synonyms
  • Utilization factor
  • Capacity factor